The short answer: if the pitch is small — five-a-side, seven-a-side, a school court, an indoor centre or a garden kick-about area — specify non-infill turf. If it is a full-size 11-a-side pitch that has to hold up to match play, sliding tackles and studs, specify infill turf with rubber granules and silica sand. The difference is not cosmetic. It changes how the surface absorbs impact, how the ball rolls, how often you have to top up, and how much the installation costs over ten years.
Below is what each system actually does, where each one wins, and the mistakes we see most often in incoming orders.
What infill actually does
Infill is the loose material — usually silica sand plus SBR or EPDM rubber granules — spread into the pile after installation. It is not there to make the turf look fuller. It does four jobs:
- Ballast. A full-size pitch is 7,000 sqm of material. Infill adds weight that keeps the carpet flat against wind uplift and thermal movement.
- Fibre support. The granules sit around the base of each fibre and hold it upright, so the pile does not flatten into a mat under repeated footfall.
- Impact and traction. Together with the shockpad underneath, the infill layer is part of the energy-absorption system. Stud grip and rotational traction at speed depend on it. This is what FIFA and World Rugby test for.
- Consistency. A properly filled surface behaves the same in month 60 as in month 2, provided it is maintained.
Take the infill away from a long-pile carpet and you lose all four. That is why you cannot simply lay a 50mm football carpet without filling it and expect match-grade performance.
Where non-infill is the better spec

A non-infill pitch in service. No rubber layer, no top-up schedule, and the surface reads a little firmer and faster underfoot — which is the point for clubs that train rather than compete on it.
Small pitches are a different problem. Players are lighter, the run-up distances are shorter, there is far less sliding, and the surface is often installed by a local contractor rather than a specialist sports builder. Here non-infill wins on almost every axis:
- Faster installation. No sand or granulate to spread, brush in and level. A small court can be finished and played on the same week.
- No crumb migration. No granules in boots, in the clubhouse, in drains, or blown into neighbouring gardens.
- No replenishment. Infill settles, compacts and washes out. It needs topping up — typically every one to three years on a busy pitch. Non-infill has nothing to top up.
- Simpler maintenance. Brush and rinse. That is the whole programme.
- Better for children and mixed use. Kindergartens, school yards and multi-use games areas get no loose rubber, which matters both practically and for procurement policies.
For five-a-side and multi-use courts we supply 20–30mm pile with a dense stitch and a dimensionally stable backing. That combination gives a firm, fast surface without any loose fill.
Where infill is not optional

50mm football turf at a density that needs infill: without a stabilising layer, players feel the backing through the pile and the fibres flatten faster.
On a full-size pitch, non-infill turf fails in three predictable places:
Impact. A 30mm non-infill carpet on a thin shockpad will not pass a head-impact or Gmax test at the levels required for competitive 11-a-side play. The energy has nowhere to go.
Traction. Studs need something to bite into. Without infill, rotational traction drops and the surface becomes either slippery when wet or grabby and joint-punishing when dry.
Pile recovery. Within a season, a long non-infill pile on a heavily used pitch flattens into visible wear lanes in front of goal and along the touchlines. Those areas never recover.
This is why the specification on a professional pitch is a system, not a product: carpet + shockpad + infill + maintenance plan. Swapping any one element out changes the certified performance of the whole.
Side-by-side comparison
| Factor | Non-infill | Infill (sand + rubber) |
|---|---|---|
| Typical pile height | 20–30mm | 40–60mm |
| Best for | 5-a-side, 7-a-side, schools, kindergartens, gyms, gardens, indoor | Full-size 11-a-side, rugby, competitive training centres |
| Installation time | Fast — carpet and go | Longer — filling, brushing, levelling |
| Upfront material cost | Lower | Higher (granulate + sand + labour) |
| Ongoing cost | Brush and rinse | Brush, rinse, plus infill top-up every 1–3 years |
| Loose material on site | None | Rubber crumb and sand |
| Impact absorption | Adequate for casual and junior play | Engineered, testable to competition standard |
| Stud traction | Limited | Designed for it |
| Regulatory direction (EU) | Increasingly preferred | Under scrutiny for microplastic loss |
A point buyers ask about more every year: microplastics
Rubber crumb is a source of intentionally added microplastic. Regulators in the EU have been moving to restrict that category of material, and several buyers — particularly in Germany, the Netherlands and Scandinavia — now write non-infill or organic infill into their tenders before price is even discussed.
We are not going to tell you rubber is banned, because it is not. But if you are specifying a community or school pitch in Europe, ask yourself whether the surface will still be compliant in ten years. On small and mid-size pitches, non-infill removes that question entirely.
The four mistakes we see in incoming orders
1. Non-infill specified for an 11-a-side pitch. It gets installed, it looks right for a season, then the wear lanes appear and there is no fix short of replacing the carpet.
2. Infill specified for a kindergarten. Loose crumb under five-year-olds is a complaint waiting to happen, and the performance benefit buys nothing at that level of play.
3. Over-filling. Fill above roughly two-thirds of the pile height and the surface plays hard, the fibres splay, and drainage slows. The infill depth should be set from the pile height, not from "until it looks full".
4. Buying the carpet without the maintenance plan. An infilled pitch that is never brushed will compact and lose its performance inside two seasons, whatever the certification says.
What we supply
We manufacture both systems, so we have no reason to push you toward the more expensive one:
- Rolls in 2.0m and 4.0m widths, cut to length, including custom shapes for small courts and putting greens
- Minimum order 50 sqm, with volume pricing from 100 sqm and project pricing from 500 sqm
- Pile height, stitch density, colour and backing built to your specification — OEM production available
- CE certified, 5-year UV warranty, tested against fading, frost and heavy foot traffic
- FOB or CIF quotes — tell us your destination port and the freight is included in the number
If you are still deciding, send us the pitch dimensions, the age group and level of play, and whether the base is concrete, asphalt or soil. We will recommend a specification rather than quote you three and leave you to guess. See the football turf range or send your dimensions for a quotation — we reply within 24 hours.
Shipping a full container? Read how many square metres fit in a 20ft container before you finalise quantities, so the order and the freight are planned together.
Frequently asked questions
Is non-infill artificial grass good enough for football?
Yes for five-a-side, seven-a-side, school and recreational pitches. No for full-size competitive 11-a-side, where impact absorption and stud traction have to meet test standards.
Do you have to put rubber in artificial grass?
Only if the surface has to perform to competition standard. Short-pile non-infill turf needs no rubber, no sand and no replenishment.
How often does infill need topping up?
Typically every one to three years depending on traffic. High-use pitches in the top-up range need it more often around goals and in the centre circle.
Which is cheaper over ten years?
Non-infill is cheaper both upfront and in running cost, because it has no granulate to buy, spread or replace. Infill is the more expensive system — and on a full-size pitch it is the only one that performs.
Related reading: pile height decides whether infill can work at all — see our guide to 10mm–50mm pile heights. If you are building a small-sided pitch, the 5-a-side build guide shows which system is worth paying for; on a full-size project, the ten-year cost comparison puts both surfaces in one table. For per-square-metre pricing and MOQ, see the wholesale page.